SECURAAI - PROJECT FERAL
EXECUTIVE REPORTS

Executive Reports

Download the official Project Feral executive reports. Phase I established the threat model foundation; Phase I.5 integrates MITRE ATLAS validation and hardening guidance.

📊
Phase I.5
Executive Report
LATEST

Updated report with MITRE ATLAS integration, real-world validation from 4 case studies, patch coverage analysis, and hardening recommendations.

7
Validated
4
MITRE Cases
3
Frameworks
MITRE ATLAS TTP mapping
CVE-2026-25253 analysis
ClawHavoc campaign coverage
Patch delta analysis
P0/P1/P2 hardening guide
Download Phase I.5 Report
📋
Phase I
Executive Report
ORIGINAL

Original threat model report with full architectural analysis, dual-framework methodology (MAESTRO + ASI), and initial threat enumeration.

3
Critical
4
High
10
Threats
MAESTRO 7-layer mapping
OWASP ASI Top 10 coverage
5 attack chain visualizations
Trust boundary analysis
Remediation roadmap
Download Phase I Report

Which report should I use? Start with Phase I.5 - it includes everything from Phase I plus real-world validation and actionable hardening guidance. Phase I is provided for reference and to document our original methodology before MITRE validation.